Core Network Relocation - SY5
Resolved
Feb 03 at 08:00pm AEDT
Hello all,
Between Saturday 03 February 2024 at 08:00pm and Sunday 04 February 2024 at 04:00am, we will be scheduling network maintenance with a full network outage for a window of up to 6 hours during this time.
During this time, we will be relocating from our current rack to our own dedicated full rack. This will result in intermittent outages while we relocate hardware and re-establish temporary cross-connects. This will result in service interruptions while we bring down our core and relocate the hardware, then reconnect the cross-connects. Our engineers will be on-site during this relocation to assist with the relocation.
If after the window closes you are still having issues, please reach out to us via a support ticket.
Affected services